Q1. Do I have to use certain electricians or contractors approved by Entergy?
A. No.
Q2. Which makes and models are eligible?
A. There are no restrictions on qualifying equipment makes or models. However, the most economical conversion would be of an existing diesel-powered unit that is 75 horsepower or greater and a well that is within 1,500 feet of a three-phased power distribution line.
Q3. Who secures and pulls a permit?
A. Customers secure the permit for the installation, either through their electrician or contractor. Once the permit is pulled, the Entergy customer service center verifies with the customer so the order can be completed.
Q4. I lease the land the well sits on. Does that change the process?
A. That depends on the arrangements the land owner has with the farmer (the lessee). In most cases, if the farmer has a short-term lease (1-3 years), the landowner likely will not pay for the improvements. However, if the farmer wants to invest in the facility, he or she should make that decision based on the cost to install electric equipment and with approval from the land owner.
In most cases where a farmer has a long-term lease (3 or more years) on the land, the farmer most likely will secure the electric service agreement and commit to the terms of the Entergy contract (3 or 4 years, depending on jurisdiction). The farmer will be the customer of record.
Q5. Does Entergy offer conversion financing?
A. No, Entergy does not offer financing per se. However, in several of our jurisdictions (Entergy Arkansas, LLC; Entergy Louisiana, LLC; Entergy Mississippi, LLC; and Entergy Texas, Inc.), Entergy offers an Additional Facility Rider (AFC), which is a monthly charge for the electric facilities customer need if they cannot pay a Cost Aid in Construction (CAIC). Call 1-844-44WELLS (1-844-449-3557) for information on AFC options.
Q6. I have more than one well. Do you plan to convert them all?
A. Entergy can aggregate the total number of wells and use the combined revenue to the customer to offset a CAIC as part of the process. Aggregating wells is typically a favorable and recommended way to assess electric distribution costs because it allows for "adding" the revenue generation from multiple wells.
Q7. Once the well is converted, do you take the old pump?
A. Entergy does not take or dispose of any farm or pumping equipment.
Q8. What happens if there is a power outage?
A. Contact Entergy at 1-800-9OUTAGE (1-800-968-8243) to report an outage. Have your account number or meter number handy to help us identify the specific location of the outage.
Q9. How do you time the conversion so it does not affect my crops and harvest?
A. During planting season (early spring) and harvest season (early fall/winter), water is not needed, except for recreational use during duck season (November through January). So the best time to convert typically is late September through April. Entergy works with individual customers to time the conversion as much as possible before irrigation season, when water is needed.
Q10. What is the typical lead time before conversion begins?
A. Conversions depend on a variety of factors including number of wells to convert, servitudes that may be needed for ingress and egress to well locations, contract acceptance, CAIC requirements, and design issues. Our goal is to contact the farmer interested in a conversion within 24 hours of receiving a request, and schedule an appointment to meet and discuss the conversion. After that meeting, an Entergy sales representative can provide a better estimate of when the conversion can begin.
Q11. What is the typical time to complete a conversion once it begins?
A. The project engineer can provide an estimate on conversion time. Project size, weather, and other variables may have an impact on conversion time.
Q12. After the sales representative contacts the farmer and Entergy is notified the farmer is interested in conversion, how long before the Entergy engineer contacts the farmer?
A. Once a work order requesting conversion is issued on a farmer's account, the farmer usually is contacted within one business day to set up an appointment with an engineer. It may take as long as two weeks before the farmer and engineer can coordinate their schedules and meet on site. Design, materials, scheduling, and construction generally take at least 3 weeks and usually 4 to 6, depending on the size of the extension and project requirements.
Q13. Who should a customer call for service on an existing electric powered irrigation well?
A. The Entergy irrigation desk will continue to answer calls and handle issues such as service turn on, turn offs, and billing questions.
Arkansas | 1-800-324-4709 |
Louisiana | 1-800-955-4744 |
Mississippi | 1-888-424-8077 |
Texas | 1-866-557-3133 |
Q14. Who is ICF?
A: ICF is an Entergy contractor that manages sales calls and requests for irrigation well (diesel/propane) conversions to electric, as well as new irrigation well installation requests.
Q15: Does the new ICF process include oil and gas wells?
A: No, oil and gas wells are handled directly by an Entergy engineer.